CW630 Pumping Stations

CW630 Pumping Stations

Location
Dubai, UAE
Client
Dubai Electricity and Water Authority (DEWA)
Scope
Design and build the infrastructure, civil, and MEP, landscape for two 60MIGD pumping stations, both being built simultaneously
Timeline
15th June 2008 to 15th Dec. 2011

Construction of two pumping stations each with 60 MIGD capacity in location no. 5 and location no. 7 complete with surge protection system and associated MEP works

With extensive experience delivering infrastructure works, our technical and commercial proposal ranked highest during tendering, giving the client confidence in selecting us for this project. Managing the build and delivery of two highly technical, large scale, and high capacity pumps simultaneously at a competitive price point ensured our entire team worked efficiently to achieve the client’s budget and timeline targets.

Get In Touch